(0 comments)

we are putting up some live edge log slabs and are going to have 4 to 5 inches of space between them they are 2'' thick and I would like to fill in some of that space before putting on the log jam I was going to use the blue installation foam board but they recommend you not to what should I do?

You should use Grip Strip.  It is a closed cell foam and will not "gas" like bead board or blue board causing the chinking to bubble.  Call 800-564-2987 to purchase.

Comments

There are currently no comments

New Comment

required

required (not published)

optional

required

required

Monthly Maintenance Tips
Get your FREE monthly log home repair and maintenance tip via email by signing up now!